After some years on the beach waiting for something to happen, the  
Kiki Dee gets some attention.  We had just finished the reconstruction  
of the lodge and bungalow with the timberframe still ahead, so we  
needed some "quick and dirty" solution to get the boat refit  
going.....  the idea was "shrink wrap".  I ordered the material and  
rented the special flame thrower and in a day, had her dry for the  
first time in many years.  Plan A was a great idea...   with a flaw.    
Add the typical winter wind and snow to the picture and down she  
goes.  Clearly a plan B was called for.
Monday, September 16, 2002
Subscribe to:
Comments (Atom)


